|
Prefeasibility Studies
|
Jurisdiction
The document is not country specific.
|
National Codes
The relevant codes are used to compile a Prefeasibility Study, since reserves may sometimes be declared in the prefeasibility stage.
|
Format
Long form reports
|
Description
This is the intermediate step in project valuation, and follows a Scoping Study and precedes a Feasibility Study. This study should include trade-off studies to determine the mining and milling extraction methods and rates, product recoveries, environmental issues, legal issues, and preliminary capital and operating cost estimates.
|
Contact
|
Name
|
Derick de Wit
|
|
Tel
|
+27 11 783 9903
|
|
|
|
|